top of page

What Site Reports are Required for Building Approvals?

2 hours ago
1 min read

Each council has an overlay mapping system which shows environmental factors affecting sites. These can include bushfire, flood, slippage, heritage, noise corridor, protection, acid sulfate soil and other overlays. Each overlay generally requires a specialist report. 

​

Before ordering site reports, a Preliminary Design (floorplan, elevations, site plan) is sent out which are referenced in the reports. The results of these reports are then added to the final Working Drawings. The result of the reports can affect design aspects such as cladding, windows, footings, site location, and overall design.

 

At this stage a treatment system should be designed, as the design of the home can affect the cost and type of system dramatically.



 
 

Related Posts

Quotes vs Estimates

We've all heard the stories of owners obtaining 'quotes' only to have the price blow out after going to contract. How does this happen? Well, without ALL the required information, most Quotes are real

 
 
Home
bottom of page