What Documents Should Go With a Build Contract?
There are many, many, many cases where build costs escalate and owners are issued seemingly endless variations. How does this happen with a Fixed Price Contract? Basically, the contract price is fixed. However, the specifications and inclusions are not of the standard the owners thought they would be, or the engineering was not completed and now there are additional 'unforeseen' works required.
A contract should contain four parts:
i) the build contract;
ii) a detailed set of Working Drawings (plans)
iii) the engineering documents, including structural and foundation designs;
iv) specifications, listing every item with Make and Model, or an allowance.
Owners should confirm the details by stating 'as per display home' or 'as per engineering' eg. Hamptons Fan HDC342, as per display home alfresco'.