What are the Design Stages for Building Approval?

2 hours ago
1 min read

There are four main stages of design prior to submitting a building approval application:

i) Preliminary Designs: these are basic floorplans, elevations and site plans and are used to obtain site reports and estimates.

​

ii) Site Reports: It is essential that all relevant site reports are obtained before completing the next stage. 

​

iii) Working Drawings: which include floorplan, site plan, elevations, door/window schedules, roofing layout, cabinetry/plumbing layout, floor coverings, electrical layout and sectional views.

​

iv) Engineering & Certifications: these are produced by specialist consultants and include energy assessment, structural engineering and foundation engineering. There may be other specialist reports required. The engineer will issue a certification for the designs, which are checked by the certifier onsite. 

​​

All Working Drawings and engineering documents (and certifications) are required for building approval. 

​

Some financial lenders will not approve finance without the Working Drawings and all engineering documents. 

​

Owners should be wary of 'cheap designs' as they are usually Preliminary Designs only with owners being charged exorbitant fees for the remaining full set of designs required. 

 
 